23ISO 25000-23Part 23 measurement record

Home / Free check

Six questions · nothing sent · no account

Where does your measurement programme stand?

A planning reading of your product quality measurement against the public structure of the draft. It names the pages to read first, the evidence to start collecting and three dated actions. It is not an audit and it does not certify.

Six answers, read in your browser against the public record. Your answers are not sent, stored or logged.

01 Which product quality model is your measure library indexed to?
02 Is there a written measurement plan naming the measures, the lifecycle stage and the target values?
03 For the measures you report, can you show the population and the measurement function?
04 How do you handle the four 2023 subcharacteristics with no separate measure family in the draft?
05 Do you hold evidence for the families you report, not only a number?
06 Who reads the result, and what do they decide with it?
Open the record

Not legal advice; does not certify. This is a planning reading of your measurement practice, not an assessment of a product or a compliance result.

What the reading means

The six answers cover the things the public contents says a programme has to manage: the model edition, the plan, the population and the measurement function, the four subcharacteristics without a family, the evidence, and the decision the result informs. The reading is a reading of those answers, not a compliance result.

The bands

PointsReadingWhat it means
0 to 4ThinThe measure set is a collection of numbers without a model, a plan or a decision. Start with the model page and the four subcharacteristics without a family, because those decide the shape.
5 to 8FormingThere is a practice, and it is not yet reproducible. The population and the measurement function are the usual gaps, and the four new subcharacteristics are usually missing.
9 to 12PlannedThe programme is in a position to absorb the published edition. The remaining work is the evidence for each family and a reading task for the day the text lands.

What it cannot see

It cannot see the quality of the product you measure, the correctness of a particular measure, or the requirement text that is not public. It cannot tell you that you conform to Part 23. It is a way to choose the next three pieces of work, not a verdict on the last three years.

What happens to your answers

Nothing leaves the page. The script reads /seed/scope.json and computes the result in your browser. No answer is sent to a server, stored in a cookie or added to a mailing list.

If the reading is low

Start with the model page. A library indexed to the 2011 model is measuring eight characteristics while the draft measures nine, and the names of two characteristics changed. Then read the four subcharacteristics without a family, because they are the ones a plan silently drops. If the reading is in the middle, the usual gap is the population and the measurement function: the number exists, and nobody can recompute it.

If the reading is high

The useful work is the evidence pack. Every measure you report should have an artefact behind it, and every family in the register should have an owner. That is the work the kit formalises, and it is the work that makes the published edition a read-through rather than a rebuild.

See the kit Open the free specimen

The rules this is built from

Read from the real rules, not invented.

Every line points to the public ISO record or the free preview it came from, so you can check it yourself.

  • Read from the real rules
  • 63 record pages behind it
  • 116 public headings checked
  • Check any line yourself

The measure set is read from the public contents; the model table is read from the public 25010:2023 model. Where the draft text is not public, the page says so instead of filling the gap.

Nothing here is guessed while you wait. Each page is written from the public record and points to the exact page it came from. Record updated 22 October 2026