23ISO 25000-23Part 23 measurement record

Home / The record / 6.3 Performance efficiency measures

ISO/IEC DIS 25000-23.2, 6.3.3 ยท Heading only

6.3.3 Resource utilization measures

Resource utilization asks how much memory, storage, network, processor time or energy the product consumes while doing its work. A measure relates consumption to the work performed.

The free preview lists this heading and its subheadings but not the requirement text. This page states what the heading requires in our words and never invents the wording.

Not legal advice; does not certify. This page states our reading of a public draft, not the standard's wording, and it is not an official interpretation.

What this heading covers

Consumption without a work unit is not a measure. The same product consumes more when it does more, so the useful form is a rate: memory per session, storage per record, energy per transaction. The 2023 model adds environmental sustainability under performance efficiency, and the draft gives it no separate family, which makes this family the natural home for an energy measure if a team needs one. The measure should say which resource, which instrument and which work unit.

Record position: family 5 of 40 in clause 6, under 6.3 Performance efficiency, which carries 3 families. It is one of the 40 families a programme has to map its measures to, and its elements are listed below. The heading is 6.3.3 in the public contents; the text behind it is not public.

How a measure for this family is built

Divide the resource consumed by the work performed: bytes of memory per concurrent session, gigabytes of storage per million records, kilowatt hours per thousand transactions. Name the instrument and the sampling interval. A peak and an average answer different questions, so report both where the resource can spike.

Our worked formula

Resource consumed divided by the work performed, with the instrument, the sampling interval and the peak reported.

Measure elements that can feed it

Duration, Number of records, Number of data items

Chosen by us from the thirty-one quality measure elements named in Annex B. The draft does not publish which elements feed resource utilization, so the choice above is a worked example, not the draft's assignment.

What to put in place before publication

  1. Name the work unit before measuring consumption, and keep it fixed across releases.
  2. Report peak and average separately, with the sampling interval.

Evidence to keep

KindWhat it looks like
InstrumentThe measurement tool, its sampling interval and its own overhead
WorkloadThe work unit the consumption is divided by

The test a reviewer asks

  • Is consumption expressed per unit of work, not as a bare total?
  • Does the result name the instrument and its sampling interval?

Two questions to ask

  • What unit of work is the consumption divided by?
  • Was this a peak or an average, and what was the sampling interval?

Where teams usually fall short

  • A memory total from one run, compared with a total from a run that did twice the work.

What the number cannot tell you

It cannot tell you whether the consumption was necessary. A product can be efficient and still waste memory on a path nobody uses.

What happens next

Capacity is the limit of the same curve. Read the two pages together if you are sizing an environment.

Source

ISO Online Browsing Platform, free preview of ISO/IEC DIS 25000-23.2 https://www.iso.org/obp/ui#iso:std:iso-iec:25000:-23:dis:ed-1:v2:en read 22 October 2026

ISO/IEC 25010:2023, Product quality model https://www.iso.org/standard/78176.html read 22 October 2026

ISO/IEC 25023:2016, Measurement of system and software product quality https://www.iso.org/standard/35747.html read 22 October 2026

The rules this is built from

Read from the real rules, not invented.

This page is read from the public record for 6.3.3: the heading in the free contents, and where public, the text the preview carries.

  • Read from the real rules
  • 63 record pages behind it
  • 116 public headings checked
  • Check any line yourself

The measure set is read from the public contents; the model table is read from the public 25010:2023 model. Where the draft text is not public, the page says so instead of filling the gap.

Nothing here is guessed while you wait. Each page is written from the public record and points to the exact page it came from. Record updated 22 October 2026