23ISO 25000-23Part 23 measurement record

Home / The record / 6.8 Maintainability measures

ISO/IEC DIS 25000-23.2, 6.8.6 ยท Heading only

6.8.6 Testability measures

Testability asks how easily the product can be tested: how much of it can be exercised, how observable it is and how much setup a test needs. A measure relates testable behaviour to the behaviour in scope.

The free preview lists this heading and its subheadings but not the requirement text. This page states what the heading requires in our words and never invents the wording.

Not legal advice; does not certify. This page states our reading of a public draft, not the standard's wording, and it is not an official interpretation.

What this heading covers

Testability has three parts: controllability, observability and the cost of the test. A coverage percentage is a partial measure and can be gamed. A better family of measures includes the proportion of requirements with an automated test, the time to set up a test environment, and the proportion of failures that can be diagnosed from the product's own output. The measure should be tied to the risk, because testing everything to the same depth is not a strategy.

Record position: family 31 of 40 in clause 6, under 6.8 Maintainability, which carries 5 families. It is one of the 40 families a programme has to map its measures to, and its elements are listed below. The heading is 6.8.6 in the public contents; the text behind it is not public.

How a measure for this family is built

Count the requirements or risks covered by an executable test as the numerator over those in scope. Add the median setup time and the proportion of failures with enough diagnostic output. Report the gaps by risk, not only as a coverage percentage.

Our worked formula

Requirements or risks covered by an executable test divided by those in scope, plus setup time and diagnostic quality.

Measure elements that can feed it

Number of test cases, Number of requirements, Duration

Chosen by us from the thirty-one quality measure elements named in Annex B. The draft does not publish which elements feed testability, so the choice above is a worked example, not the draft's assignment.

What to put in place before publication

  1. Map tests to requirements or risks, not only to code.
  2. Measure the setup time and the diagnostic quality as well as coverage.

Evidence to keep

KindWhat it looks like
Coverage mapThe requirements or risks and the test that covers each
DiagnosticsThe output available when a test fails, and whether it located the cause

The test a reviewer asks

  • Is the coverage mapped to risk, or to lines of code?
  • Can a failing test be diagnosed without a debugger?

Two questions to ask

  • Are tests mapped to requirements or risks, or only to code?
  • How long does a test environment take to set up, and can a failure be diagnosed from the output?

Where teams usually fall short

  • A line coverage figure presented as testability.

What the number cannot tell you

It cannot tell you whether the tests are good. A test can execute a requirement and assert nothing useful about it.

What happens next

Flexibility is next: the four families about changing context, scale and installation.

Source

ISO Online Browsing Platform, free preview of ISO/IEC DIS 25000-23.2 https://www.iso.org/obp/ui#iso:std:iso-iec:25000:-23:dis:ed-1:v2:en read 22 October 2026

ISO/IEC 25010:2023, Product quality model https://www.iso.org/standard/78176.html read 22 October 2026

ISO/IEC 25023:2016, Measurement of system and software product quality https://www.iso.org/standard/35747.html read 22 October 2026

The rules this is built from

Read from the real rules, not invented.

This page is read from the public record for 6.8.6: the heading in the free contents, and where public, the text the preview carries.

  • Read from the real rules
  • 63 record pages behind it
  • 116 public headings checked
  • Check any line yourself

The measure set is read from the public contents; the model table is read from the public 25010:2023 model. Where the draft text is not public, the page says so instead of filling the gap.

Nothing here is guessed while you wait. Each page is written from the public record and points to the exact page it came from. Record updated 22 October 2026