What this heading covers
The measure is tied to an interface and a message set, and both have versions. An exchange that succeeds against a mock and fails against the live system is not a successful exchange, so the test environment belongs in the definition. Interoperability covers sending, receiving and using the information, and a product can do the first two and fail the third. The measure should include the error handling for malformed or partial messages, because that is where interoperability usually breaks.
Record position: family 8 of 40 in clause 6, under 6.4 Compatibility, which carries 2 families. It is one of the 40 families a programme has to map its measures to, and its elements are listed below. The heading is 6.4.3 in the public contents; the text behind it is not public.
How a measure for this family is built
Take the number of message exchanges completed and used correctly as the numerator over the number of exchanges specified in the interface test as the denominator. Name the interface version and the message set version. If the exchange is asynchronous, define the timeout and how a late message is counted.
Our worked formula
Exchanges completed and used correctly divided by exchanges specified, at a named interface and message set version.
Measure elements that can feed it
Number of interfaces, Number of interface items, Number of responses
Chosen by us from the thirty-one quality measure elements named in Annex B. The draft does not publish which elements feed interoperability, so the choice above is a worked example, not the draft's assignment.
What to put in place before publication
- Version the interface and the message set in the measure definition.
- Include negative cases: malformed, partial and late messages.
Evidence to keep
| Kind | What it looks like |
|---|---|
| Interface record | The interface version, message set and test environment |
| Exchange log | Each exchange, its result and the handling of any malformed message |
The test a reviewer asks
- Is the interface version recorded with the result?
- Does the measure cover using the information, not only receiving it?
Two questions to ask
- Which interface and message-set version was tested?
- Were malformed, partial and late messages part of the test?
Where teams usually fall short
- An interoperability pass against a mock that was built from the same assumptions as the product.
What the number cannot tell you
It cannot tell you whether the other system behaved correctly. An exchange failure can belong to either side, and the measure does not allocate blame.
What happens next
Security measures are the next concern for an interface that carries data between organisations.
Source
ISO Online Browsing Platform, free preview of ISO/IEC DIS 25000-23.2 https://www.iso.org/obp/ui#iso:std:iso-iec:25000:-23:dis:ed-1:v2:en read 22 October 2026
ISO/IEC 25010:2023, Product quality model https://www.iso.org/standard/78176.html read 22 October 2026
ISO/IEC 25023:2016, Measurement of system and software product quality https://www.iso.org/standard/35747.html read 22 October 2026