23ISO 25000-23Part 23 measurement record

Home / The record / 6.6 Reliability measures

ISO/IEC DIS 25000-23.2, 6.6.2 ยท Heading only

6.6.2 Faultlessness measures

Faultlessness asks how rarely the product fails in operation or in test. A measure relates failures to the exposure that produced them.

The free preview lists this heading and its subheadings but not the requirement text. This page states what the heading requires in our words and never invents the wording.

Not legal advice; does not certify. This page states our reading of a public draft, not the standard's wording, and it is not an official interpretation.

What this heading covers

A failure count without exposure is not comparable. Exposure can be time, transactions, users or sessions, and the right unit depends on the product. The draft separates faultlessness from availability because a product can be unavailable for reasons other than failure, such as planned maintenance, and can fail without becoming unavailable if it recovers. The measure should use a written failure definition and a severity scale, and it should name the window.

Record position: family 17 of 40 in clause 6, under 6.6 Reliability, which carries 4 families. It is one of the 40 families a programme has to map its measures to, and its elements are listed below. The heading is 6.6.2 in the public contents; the text behind it is not public.

How a measure for this family is built

Divide the number of failures by the exposure: failures per thousand hours of operation, per million transactions, or per hundred users. State the severity threshold that counts. A rate is comparable across releases; a raw count is not. If the product is new, use test exposure and label it as such.

Our worked formula

Failures at or above the stated severity divided by the exposure, in a named window and unit.

Measure elements that can feed it

Number of failures, Number of faults, Duration

Chosen by us from the thirty-one quality measure elements named in Annex B. The draft does not publish which elements feed faultlessness, so the choice above is a worked example, not the draft's assignment.

What to put in place before publication

  1. Write the failure definition and the severity scale before collecting.
  2. Report the exposure with the rate, and keep the raw failures.

Evidence to keep

KindWhat it looks like
Failure definitionWhat counts as a failure, at which severity, in which window
ExposureThe operating or test exposure that produced the failures

The test a reviewer asks

  • Does the measure state its exposure and its window?
  • Is the failure definition the same one used by the other reliability families?

Two questions to ask

  • What is the failure definition and the severity threshold?
  • What exposure produced these failures, and over what window?

Where teams usually fall short

  • A defect count from a tracker that mixes customer failures with internal test findings.

What the number cannot tell you

It cannot tell you how long a failure lasted. A short outage and a long one count the same in a failure rate.

What happens next

Availability adds the time dimension. Read the two together before reporting either.

Source

ISO Online Browsing Platform, free preview of ISO/IEC DIS 25000-23.2 https://www.iso.org/obp/ui#iso:std:iso-iec:25000:-23:dis:ed-1:v2:en read 22 October 2026

ISO/IEC 25010:2023, Product quality model https://www.iso.org/standard/78176.html read 22 October 2026

ISO/IEC 25023:2016, Measurement of system and software product quality https://www.iso.org/standard/35747.html read 22 October 2026

The rules this is built from

Read from the real rules, not invented.

This page is read from the public record for 6.6.2: the heading in the free contents, and where public, the text the preview carries.

  • Read from the real rules
  • 63 record pages behind it
  • 116 public headings checked
  • Check any line yourself

The measure set is read from the public contents; the model table is read from the public 25010:2023 model. Where the draft text is not public, the page says so instead of filling the gap.

Nothing here is guessed while you wait. Each page is written from the public record and points to the exact page it came from. Record updated 22 October 2026