What this heading covers
The introduction names the lifecycle stages the draft is written for: requirements analysis, design specification, coding, testing through acceptance, and maintenance. The measure set has to be read against those stages, because a measure that is cheap at test can be impossible at operation and a measure that only exists at operation cannot inform a design decision. The annex is where the draft would set out which measures are available when. It matters commercially: a supplier answering a tender needs measures it can evidence before delivery, and an acquirer needs measures it can verify at acceptance and monitor in operation.
Record position: annex 4 of 5. The heading is D in the public contents; its text is informative and not public.
What the heading asks of a team
Before code
Requirements and design measures are mostly inherent and documentary: completeness of the requirement set, coverage of the design against the model, the presence of a measurable quality requirement.
During test
Most of the forty families can be evidenced here, from correctness and performance to interaction and safety, because the product can be exercised.
In operation
Reliability, availability, security events and some interaction measures become cheaper and more truthful, while maintainability measures need repository access and may not be available to an acquirer.
What to put in place before publication
- Draw a stage map with the forty families down one side and the lifecycle stages across the top.
- Mark where each measure is available, where it is expensive, and where it is not available at all.
- Choose, for each stage gate, the smallest set that informs the decision at that gate.
- Agree with the acquirer which measures will be evidenced at acceptance and which will be monitored in operation.
- Record the stage in every result, because a measure taken at test is not the same claim as one taken in operation.
The test a reviewer asks
- Does every result name the lifecycle stage at which it was taken?
- Is the acceptance measure set agreed before delivery, not after?
Where teams usually fall short
- A supplier asked for operational reliability evidence before the product has run in operation.
- A design gate that asks for measures the product cannot produce until test.
What happens next
Annex E is the last annex and it deals with measurement uncertainty, which matters most where a lab or an assessor signs the result.
Source
ISO/IEC DIS 25000-23.2, standard record 89069 https://www.iso.org/standard/89069.html read 22 October 2026
ISO Online Browsing Platform, free preview of ISO/IEC DIS 25000-23.2 https://www.iso.org/obp/ui#iso:std:iso-iec:25000:-23:dis:ed-1:v2:en read 22 October 2026
ISO/IEC 25023:2016, Measurement of system and software product quality https://www.iso.org/standard/35747.html read 22 October 2026